Search
 
Events | Case Studies

 
   
  Outsourcing Technology
   
INTEGRATED TEXTILE SOLUTIONS

VISUAL SPIN
 
Planning and Balancing of Single or Multi-phased Production In a Spinning Mill

With Visual-Spin the possibility is available to plan/schedule just the spinning department work center (single-phase configuration), or this control can be extended to also balance and optimize the processes before and after spinning (multi-phase configuration).

VISUAL-SPIN, through a truly interactive GUI (Gantt chart for each single Spinning work-center), can be parameterized at the level of production unit/lines (families of products that are homogeneous and can be autonomously defined by the user.)

VISUAL-SPIN is natively integrated with Porini G-TeX ERP or can be utilized in a stand-alone environment.

VISUAL-SPIN plans and schedules while taking into consideration the following factors:

The operative calendar of each single production resource with all the variables such as shifts, extra-hours, stops for holidays, repairs etc.
The levels of use for each resource such as entire machine, single side and number of heads/spindles.
The links among bills of material given by the codes of the intermediate products (wick, sliver, etc), also considering all kinds of waste. The system also manages bills of materials for blended fibres or melange.
The quantities for each blend that is required for producing the needed quantity of yarns, always allowing intervention when the average count goes out of tolerance range.
The availability control of material handling mediums such as cans, bobbins, using indicators of minimum and maximum stock levels defined for each cost centre.